Double Layer Roof Sheet Roll Forming Machine Test Running in our factory

A double layer roof sheet line test run in our factory for a long-standing customer in Australia, with video of the run.

Delivered
Customer
Long-standing customer in Australia
Double Layer Roof Sheet Roll Forming Machine Test Running in our factory
  • Test run Completed in our factory
  • Profile Double layer roof sheet

Project background

What this line was built for

Recorded at the time of the order. For full machine specifications, see the model page linked below.

Double Layer Roof Sheet Roll Forming Machine test running successfully in our factory. The machine is for our Australian old customer.

Test run

Watch the line running

Filmed in our workshop on production material, before the machine was packed. This is the run the customer reviewed and approved.

Machine in this project

The line used for this order

Specifications, options and tooling scope for this machine family — including the configuration this customer ordered.

How a project runs

The same four stages, every order

  1. 01

    Profile and coil review

    We start from your section drawing and coil specification — developed width, thickness range, material grade — and confirm line speed, cutting method and automation level before quoting.

  2. 02

    Factory test run

    Every line is assembled and run on production material in our Wuxi workshop. Cut length, section tolerance and line speed are checked against the order, and the run is recorded for the customer.

  3. 03

    Export packing

    Modules are separated, protected and packed in wooden crates; the hydraulic station and control cabinet travel separately. We prepare the packing list and documentation set for your forwarder.

  4. 04

    Installation and training

    Our engineers can travel to site to assemble and align the line, run trial coils and train operators. Afterwards we stay available for remote support and spare parts.

Next step

Need a line like this one?

Send your section drawing, material and thickness, the output you need per shift and where the line will be installed. We will come back with the line configuration, tooling scope and delivery schedule — usually within one working day.

Or check the machine family on the product page.