Sliding Gate Guide Rail Roll Forming Machine delivery to Russian Customer
A sliding gate guide rail line shipped to a Russian customer who moved from buying finished rails to producing them in house.
- Delivery May 2023
- Profile Sliding gate guide rail
- Configuration Decoiler, forming machine, hydraulic cutter, hydraulic station, PLC cabinet
- Origin Referred by an existing Chinese customer
Project background
What this line was built for
Recorded at the time of the order. For full machine specifications, see the model page linked below.
Sliding Gate Guide Rail Roll Forming Machine is loading to our Russian customer on 7th, May, 2023. This Russian customer before always bought the sliding gate guide rail from our Chinese local customer.Now because their quantity requirement increased, they need produce themselves, and introduced by our Chinese local customer, as they are very happy with the final product quality produced by us, they final buy this sliding gate guide rail roll forming machine from us.
Sliding gate guide rail roll forming machine is designed to produce guide rail/ truck for the sliding gate. The whole sliding gate guide rail roll forming machine is composed of decoiler, main forming machine, hydraulic cutting device, hydraulic station, PLC control box, etc.
Test run
Watch the line running
Filmed in our workshop on production material, before the machine was packed. This is the run the customer reviewed and approved.
How a project runs
The same four stages, every order
-
01
Profile and coil review
We start from your section drawing and coil specification — developed width, thickness range, material grade — and confirm line speed, cutting method and automation level before quoting.
-
02
Factory test run
Every line is assembled and run on production material in our Wuxi workshop. Cut length, section tolerance and line speed are checked against the order, and the run is recorded for the customer.
-
03
Export packing
Modules are separated, protected and packed in wooden crates; the hydraulic station and control cabinet travel separately. We prepare the packing list and documentation set for your forwarder.
-
04
Installation and training
Our engineers can travel to site to assemble and align the line, run trial coils and train operators. Afterwards we stay available for remote support and spare parts.
Next step
Need a line like this one?
Send your section drawing, material and thickness, the output you need per shift and where the line will be installed. We will come back with the line configuration, tooling scope and delivery schedule — usually within one working day.
Or check the machine family on the product page.